Proud to be leader in Health Safety & Environment (HSE) Management System, being the first in Pakistan to achieve ISO 14001 and OHSAS 18001 certification in November 2002.
Revamped the Platformer Unit to achieve capacity enhancement (from 340 to 450 Metric Tons per Stream Day (MTSD) and have also improved our energy efficiency quotient.

Have recently benchmarked Refinery performance with other Refineries of the world and have positioned ourselves as one of the top performers in HSE and in Operating Costs within the hydroskimming sector.

Installed and commissioned a state-of-the-art Waste Water Treatment Plant to meet National Environment and Quality Standards (NEQS).
Have started the production and supply of unleaded 90 RON Motor Gasoline.
Have completed a major modification to the crude heaters. In consequence thereof High Speed Diesel (HSD) yield increased by about 2% by weight and improved furnace efficiency by 10%.
Have had the PRL laboratory ISO 9001 certified since 1999.
Have converted the Fuel Oil x-country pipeline to HSD service from August 20, 2000, thereby bridging the gap between the Keamari Port and the PARCO pipeline system.
Have inducted a Desalting Unit to improve quality of Fuel Oil.
Upgraded / Modified the Instrumentation by installing a Distributed Control System and initiated the induction of an Advance Process Control System.
Have installed a Desalination Plant. We are currently meeting about 30% of our water needs through this facility.
Introduced SAP software for Inventory and Plant Maintenance Management and for the production of company financials.
Commissioned the Fuel Oil gantry project at Korangi terminal in July, 2000.
Production of Liquid Petroleum Gas (LPG) increased from 40 to 65 MTSD in August, 1996.
Eased infrastructure constraints by offering tankage at Keamari to marketing companies and thereby facilitated receipt of imported HSD.
 